Phase 1: $12.5M

Middle School High School:

  • Replace athletic field turf carpet
  • Middle school roof replacement

Staley Eco Building:

  • Roof Replacement

 

Phase 2: $40.1M

Kaegebein Elementary:

  • Structural remediation in select classrooms
  • Replacement of Phys. Ed. Office flooring
  • Classroom HVAC replacements and upgrades to include new heating and cooling systems in all classrooms.

Huth Elementary:

  • Structural remediation in select classrooms
  • Classroom HVAC replacements and upgrades to include new heating and cooling systems in all classrooms.

Sidway Elementary:

  • Replace exterior doors and steps by the playground including adding a sidewalk over to the playground for ADA access.
  • Classroom HVAC replacements and upgrades to include new heating and cooling systems in all classrooms.

 

Phase 3: $16.6M

Middle School:

  • Renovate MS locker rooms, including new finishes and lockers.
  • Replace MS classroom flooring in select (14) classrooms in the 1967 portion of the building
  • Add air conditioning to the MS Cafeteria
  • Replace the wall tile in the ramp near the MS main entrance

High School:    

  • Renovate HS Locker rooms, including new finishes and lockers.
  • Replace window systems at the Cafeteria and Library Hallway
  • Auditorium upgrades to include New projector, screen, and camera
  • Upgrades to the basement sump pump

MSHS Complex:

  • Replace all corridor lockers
  • Add a one button lockdown alert system
  • Network infrastructure & Wi-Fi upgrades