Scope of Work
Dr. Graham's Proposal Presentation
Proposed Scope of Work
Phase 1: $12.5M
Middle School High School:
- Replace athletic field turf carpet
- Middle school roof replacement
Staley Eco Building:
- Roof Replacement
Phase 2: $40.1M
Kaegebein Elementary:
- Structural remediation in select classrooms
- Replacement of Phys. Ed. Office flooring
- Classroom HVAC replacements and upgrades to include new heating and cooling systems in all classrooms.
Huth Elementary:
- Structural remediation in select classrooms
- Classroom HVAC replacements and upgrades to include new heating and cooling systems in all classrooms.
Sidway Elementary:
- Replace exterior doors and steps by the playground including adding a sidewalk over to the playground for ADA access.
- Classroom HVAC replacements and upgrades to include new heating and cooling systems in all classrooms.
Phase 3: $16.6M
Middle School:
- Renovate MS locker rooms, including new finishes and lockers.
- Replace MS classroom flooring in select (14) classrooms in the 1967 portion of the building
- Add air conditioning to the MS Cafeteria
- Replace the wall tile in the ramp near the MS main entrance
High School:
- Renovate HS Locker rooms, including new finishes and lockers.
- Replace window systems at the Cafeteria and Library Hallway
- Auditorium upgrades to include New projector, screen, and camera
- Upgrades to the basement sump pump
MSHS Complex:
- Replace all corridor lockers
- Add a one button lockdown alert system
- Network infrastructure & Wi-Fi upgrades